Taken from the roll call in the town’s own minutes. The minutes record who was not there and almost never why.
What was decided (4 motions)
4 carried, 0 recorded otherwise. Every motion below is printed as the minutes print it.
That the Lakeshore Road West Class Environmental Assessment Update (EA), as presented in the staff report dated June 22, 2021, from the Transportation and Engineering Department be received. 2. That staff be directed to conclude the Lakeshore Road West Environmental Study. 3. That the Preferred Solution concept proposed in the EA be received. 4. That staff be directed to prepare detailed design of the proposed preferred solution for Council consideration. 5. That the detailed design consider options to limit tree loss. 6. That the detailed design consider options to limit the taking of private property. 8. That the detailed design provide Council with an analysis of the climate change impacts. 9. That the detailed design process include public consultation, to be provided to Council with staff evaluation of the public comments. 10. That staff be directed to prepare a separate EA for McCraney Bridge Improvements and file on the public record for a 30 day review period. 11. That staff be directed to consider inclusion of the recommended works in the capital forecast. 12. That additional investigation be done on drainage options to maintain a rural profile where it exists.
Moved by Councillor Chisholm, seconded by Councillor Robertson 1
Carried
That the detailed design consider options to provide a multi use trail in Blocks 2, 3 and 4.
Moved by Councillor Chisholm, seconded by Councillor Robertson 7
Carried
That the by-law noted above be passed.
Moved by Councillor Duddeck, seconded by Councillor Longo
Carried
1. That the Lakeshore Road West Class Environmental Assessment Update (EA), as presented in the staff report dated June 22, 2021, from the Transportation and Engineering Department be received. 2. That staff be directed to conclude the Lakeshore Road West Environmental Study. 3. That the Preferred Solution concept proposed in the EA be received. 4. That staff be directed to prepare detailed design of the proposed preferred solution for Council consideration. 5. That the detailed design consider options to limit tree loss. 6. That the detailed design consider options to limit the taking of private property. 8. That the detailed design provide Council with an analysis of the climate change impacts. 9. That the detailed design process include public consultation, to be provided to Council with staff evaluation of the public comments. 10. That staff be directed to prepare a separate EA for McCraney Bridge Improvements and file on the public record for a 30 day review period. 11. That staff be directed to consider inclusion of the recommended works in the capital forecast. 12. That additional investigation be done on drainage options to maintain a rural profile where it exists. Special Council Minutes July 6, 2021 - 6:30 p.m.